Marc_C
Active member
A new foot overnight, with another predicted for the day. The LCC road closed at 9:30a for avi control work. Original estimated reopening was 11a, but here's the 11:15a update from Snowbird:
Edited to add: Just got a call from a friend who is staying at the Cliff Lodge - all of Snowbird and Alta currently under full interlodge. And a lot of people freaking out about missing their flights this afternoon and evening.
Road Conditions
Please be advised the canyon is closed for avalanche control work. The estimated reopening time is 1:00pm.
Click here for Utah Commuterlink information. Snowtires are required on all vehicles entering the canyon. For the latest road conditions, you may also call our road report at (801) 933-2100.
Mountain Conditions*
All lifts are currently closed due to weather and avalanche control work. Snow conditions today include powder,packed powder, and machine groomed runs.
Lift Status*
Tram(9am-3:45pm): Closed
Peruvian Express(9am-4:00pm): Closed
Peruvian Tunnel(9am-3:30pm): Closed
Gadzoom(9am-4:00pm): Closed
Mid-Gad(9am-4:15pm): Closed
Gad II(9am-4:00pm): Closed
Little Cloud(9am-3:45pm): Closed
Baby Thunder(9am-3:30pm): Closed
Wilbere(9am-4:30pm): Closed
Chickadee(9am-5pm): Closed
Mineral Basin Express(9am-3:30pm): Closed
Baldy Express(9am-3:30pm): Closed
Terrain Park*
Closed
Alta-Snowbird Connection*
Closed
Edited to add: Just got a call from a friend who is staying at the Cliff Lodge - all of Snowbird and Alta currently under full interlodge. And a lot of people freaking out about missing their flights this afternoon and evening.